Logo Small


www.selectcivil.com.au » Contracting » Waste Management » Elizabeth Drive LandFill
Printer friendly page

Waste Management

Project:Elizabeth Drive LandFill
Client:Suez Environement- Sita Australia
Description of Work:Landfilling operation in compliance with DECC and council consent conditions. (EPA licence 4068) Supply of plant and personel to Place, Compact and Cover General Solid Waste on a cost per ton basis to Sita australia's Standards. Manage Stormwater : Supply and operation of suitable pumps to manager stormwater in various locations on site. Manage Leachates: Installation of pumps, operation and control of leachate levels in various sumps. Manage Dust : Dust control of service roads&stockpile areas, as well as dusty waste loads as required. Control of Mud & debris form leaving site. Control of site litter at tipping face, excavation areas, site perimeter and access roads.
Contract Value:10 000 000
Duration:5 years
Thumbnails
Hover mouse over thumbnails to change main picture
Click on a thumbnail to view a larger image

06072009 121.jpg06072009 120.jpg06072009 119.jpg06072009 118.jpg06072009 117.jpg
06072009 121.jpg